Build my Matrak
How it works

From first click to go-live.

Pick the modules and systems you need, get the plan that fits, bring your team in and go live. Start free, or book a demo and we'll set it up with you.

  • Free plan, no card
  • Monthly or annual plans
  • Card or invoice
Matrak quick project set-up: what do you need help with, with options like materials management, embodied carbon tracking and reporting, beside an embodied carbon report
Quick project set-up: pick what you need help with.
1,000active items on the Free planStart on a real project without a card.
MatrakTue 8:42amStarter fits your project6,000 active items, 3 collaborator seats.
MatrakWed 9:15amYour team is inPM, super and two trades on the same project.

One record for builders, trades and suppliers, from the factory to handover.

projects run on Matrak
1,300+
of products tracked
$60B+
trades supported
90+
countries
18

Every one of them started with one project.

  • Multiplex
  • John Holland
  • Gammon
  • Roberts Co
  • SRG Global
  • Built
  • Reece
  • Singyes
How you start

Four steps from here to live.

Pick what you need, get the plan that fits, bring your team in and go live when you're ready.

2 minutes

Build your Matrak

Pick the modules you need and the systems you already use, like Procore, Aconex or Autodesk.

+Quality+Logistics+Procore
Free to start

Get your plan

Answer three quick questions and we recommend the plan that fits. Free covers up to 1,000 active items.

Unlimited users

Bring your team in

Invite your own people, then your trades and suppliers onto the same project.

When you're ready

Go live

Activate your plan by card in the app, or by invoice with our team.

ActivateCard in the app, or invoice
Build my MatrakThe Free plan needs no card. Prefer a walkthrough? Book a demo.
Live sampleHorizon Tower

Then, on a real job

Watch one project run itself.

Scroll through a sample job. Each team's scans, photos and sign-offs hand the work to the next team, company and country.

1,300+projects run on Matrak
$60B+of products tracked
90+trades supported
01 / 07

Estimation

AI reads your drawings and counts every item across hundreds of pages in minutes.

Who does the workEstimator + Digi
ReplacesTakeoff tools
Review & configure →ListDetail
Plumbing_L1.pdfFullSplit
B01B02B03B04B05RISERCORRIDORB06B07B08B09PLANT
Pipes · 0⤓ Download
IDCodeProductDegSize
CancelConfirm
02 / 07

Manufacturing

Track production from factory floor to dispatch. QR scans, CNC outputs and inspection results, automated.

Who does the workFactory QA · QR scan
ReplacesProduction tracking
Progress tracker▾ Horizon TowerRS
LevelFacade status
Level 02
Level 03
Level 04
Level 05
Level 06
Level 07
Level 08
Level 09
Level 10
Level 11
Level 12
Level 13
✓
Run rates · Facade assemblyProduction throughput vs deadline
Facades ▾Status 1 ▾Last 8 weeks ▾March 28th ▾
W1W2W3W4W5W6W7W85040200
W8: 45 panels/wk
On target for March 28th
Facades assembled (last 8 weeks)
03 / 07

Supply chain

Source-to-site logistics. Shipping updates, in-transit tracking and delivery coordination across 18 countries.

Who does the workFreight forwarder · scan at gate
ReplacesStatus chasing
Search across your project…Window packageRS
Grouped by 1Filter 1Linked records
Group by relationshipStatusDeliveryStillage
▶ Shipping_container_01 12In transit24/09/26Still_01
▶ Still_01 5In transit24/09/26EOD_01+4
EOD_01 1In transit24/09/26Still_01
EOD_01_Frame In transit24/09/26Still_01
EOD_03 In transit24/09/26Still_01
EOD_04 In transit24/09/26CW_L2_001
EOD_05 In transit24/09/26Still_01
▶ Still_02 6In transit24/09/26Container_01
EOD_06 In transit24/09/26Still_02
EOD_07 In transit24/09/26Still_02
▶ Shipping_container_02 8Arrived at yard18/09/26Still_03
▶ Shipping_container_03 15Delivered02/09/26Still_04
▶ Shipping_container_04 10Packed05/10/26Still_05
▶ Shipping_container_05 14Delivered26/08/26Still_06
▶ Shipping_container_06 9Installed09/08/26Still_07
▶ Shipping_container_07 6In transit28/09/26Still_08
▶ Shipping_container_08 11Arrived at yard21/09/26Still_09
04 / 07

Inventory

Warehouse and laydown management. Scan in, allocate to zones, track movements, auto-reorder at thresholds.

Who does the workStoreman · scan in, scan out
ReplacesManual reconciliation
Inventory dashboard▾ Horizon TowerRB
Steel beamsBlueScope Steel
847
of 1,200 (70.6%)
In stock
Facade panelsKingspan AU
312
of 860 (36.3%)
In transit
ReinforcementInfraBuild
64
of 940 (6.8%)
Low stock
Consumed todayAll trades
128
Scanned at 4:12pm
+23% vs avg
MEP fixturesReece Plumbing
905
of 3,368 (26.9%)
Not started
DefectsAll trades
3
Auto-reorder sent
ETA 2 days
✓My workToday's picking lists
PO-4417(12 items)Steel
PO-4418(8 items)MEP
PO-4419(24 items)Facade
PO-4420(6 items)Rebar
PO-4421(15 items)Fire
PO-4422(3 items)Elec
05 / 07

Quality

ITPs built from the contract and the takeoff. The site engineer ticks them off on their phone; sign-off flows to the programme.

Who does the workSite engineer · phone
ReplacesManual ITP checking
9:41
Apt 304 · Wet area ITP
WaterproofingTilingFixturesSign-off
Waterproofing0/4
Membrane continuous at floor and walls
PassFailN/A
DefectActionCommentAttachments
Upturn at door and hob at least 100 mm
PassFailN/A
DefectActionCommentAttachments
Bath hob set-down
PassFailN/A
DefectActionCommentAttachments
Flood test 24 hrs, no leaks
PassFailN/A
DefectActionCommentAttachments
Inspect next room →
06 / 07

Schedule

Monitors your programme for revisions. Creates tasks, assigns subbies, calculates throughput, escalates delays.

Who does the workPM · reads it, never types it
ReplacesManual data entry
Attention required 3
Metro Security SystemsProject setup not started
Updates 0Days since start 442
Performing well 14
RailTech EngineeringOn track
Updates 7,865 ↑Active users 78
ProjectsHealthActivity
AprJunAugOctDecFeb
▸ Mercy Hospital
Mercy Hospital
▾ Silicon Valley DC
Silicon Valley DC
Server racks on site
Server racks on site
Power distribution
Power distribution
▸ Harbour Bridge refurb
Harbour Bridge refurb
▸ Skyline Apartments
Skyline Apartments
⚠ MEP running 6 days behind on Silicon Valley DC · auto-escalated to PM
07 / 07

Carbon

Every product's embodied carbon from EPDs and packing lists. A real-time budget as materials arrive on site.

Who does the workSuppliers' EPDs · automatic
ReplacesSpreadsheet calcs
Carbon emissions reporting▾ New buildMS
Carbon actual vs budgetActual: 0 tCO₂eBudget: 12,400 tCO₂e
Actual to dateRemaining budgetOver budget
CategorySupplierDescriptionWeightEPD reviewStatusGWP kgCO₂e
▸ Superstructure24,5003,412.8
▸ Facade8,6001,890.4
▾ Fitout12,457—
Austral StoneNatural stone benchtops2,100 Analysing
FormCraft JoineryTimber joinery units1,890 Analysing
TileWorks IntlPorcelain floor tiles2,300 Analysing
GreenBuild PlyPlasterboard partitions1,600 Analysing
PaintPro CoatingsInterior paint systems950 Analysing
FloorTech AUCarpet & vinyl flooring1,225 Analysing
CedarLine DoorsInternal door sets780 Analysing
MetalEdge FixturesIronmongery hardware340 Analysing
AcoustiPanel CoAcoustic ceiling tiles1,272 Analysing
▸ External works3,400680.1

Every team stays in step without the chasing.

That's the whole platform. Now find where you fit in it.

Find your fit

Where do you fit in the job?

Pick your role. See the stages you touch, and what Matrak takes off each one.

I'm a…

You touch 5 of 7 stages. Matrak connects all seven, so nothing is typed twice.

  1. EstimateEstimation
  2. MakeManufacturing
  3. SupplySupply chain: you touch this stage
  4. StockInventory: you touch this stage
  5. QualityQuality: you touch this stage
  6. ScheduleSchedule: you touch this stage
  7. CarbonCarbon: you touch this stage

Recommended for you

  • QualityITPs built from your drawings. Trades sign off on site, with photos.
  • ScheduleProgress colours in on the drawing. Nobody asks “where are we at?”
  • LogisticsEvery delivery booked to a gate and a crane. Nothing to chase.
  • CarbonScope 3 on every line, ready before the client asks.
20 hrsa week of ITP admin goneHandover without the 3am panic.
Your Matrak

Pick what goes in your Matrak.

Add the modules you want, then build your Matrak and we'll recommend the plan that fits.

AI TakeoffTurn your drawings into a priced bill of quantities, with every item marked up.Read more
EstimationPriced quotes from your own catalogue, revision-aware.Read more
ProcurementOrders raised from the BoQ, suppliers confirm in one place.Read more
ManufacturingProduction tracked factory floor to dispatch, by QR.Read more
LogisticsEvery delivery tracked from dispatch to the hoist.Read more
InventoryKnow what's on site, where, and what's still coming.Read more
InstallationInstall progress logged on the drawing, with photos.Read more
QualityITPs, inspections and sign-offs, from the drawings.Read more
ScheduleProgress that updates itself from the site.Read more
CarbonScope 3 embodied carbon on every line, every revision.Read more

Something else?

Precast, facade, FF&E, bathroom pods. Tell us what you track and the team sets up the workflow with you.

Ask Digi, bottom right →
Nothing added yetPick any to start. You can change it later.
Build my Matrak
Integrations

Connect once. Everything flows.

Tap the systems you already use. Drawings, orders and paperwork sync in, and your team keeps working where it works.

FAQ

Straight answers.

Anything not here? Ask Digi and someone from the team will reply by email.

Start with one project.

Start free on up to 1,000 items, or build your Matrak and we'll recommend the plan that fits. Prefer a walkthrough? Book a demo.

Free plan: up to 1,000 active items, no card needed · Monthly or annual plans · AI Takeoff from A$89 a trade