Build my Matrak
Quality · ITPs, inspections, sign-off

ITPs signed off on site, with photos.

Your ITPs, checklists and defects, linked to every item from factory to install. Trades sign off on the phone, with photos. Handover builds itself.

See how it works
  • Works with the ITPs you already use
  • Photos on every check
  • Full audit trail
The real Matrak app, replicated
20 hrsa week of ITP admin goneHandover without the 3am panic.
Matrak · QualityFri 4:02pmAll Level 2 panels signed offHandover pack updated.

One record for builders, trades and suppliers, from the factory to handover.

projects run on Matrak
1,300+
of products tracked
$60B+
trades supported
90+
countries
18

Behind every sign-off, a record you can stand behind.

  • Multiplex
  • John Holland
  • Gammon
  • Roberts Co
  • SRG Global
  • Built
  • Reece
  • Singyes
How it works

How it runs on a real job.

Set your ITPs up once. Every check after that happens on site, and the paperwork writes itself.

A Matrak tiling progress report: each apartment's status with inspection results pass, fail or N/A, and start and due dates
Checks per apartment: pass, fail or N/A, at a glance.
Watch it on a real job
Why it's different

The defect stays on the item.

Other QA apps pin a defect on a floor plan. Matrak ties it to the item itself: its factory, its delivery, its installer.

Other QA appsMatrak
Logs the defectGets it fixed: manufacturer, supplier and installer coordinated
Pinned on a floor planLinked to the item, its batch and its install zone
Knows when the sub says “done”Knows when it was ordered, shipped, delivered and installed
Panel L04-U12 · surface scratchingLogged
  1. Fail logged, with a photoSite engineer
  2. Assigned to the manufacturerAutomatic
  3. Replacement made and QA'dFactory
  4. Replacement delivered to siteLogistics
  5. Re-installed and signed offInstaller

Closed, with the whole history on one record.

Who it's for

Everyone sees the view they need.

Directors see the risk and site teams see what's next, all from the same live record.

  • Construction directorsQuality checks captured at the source, so rework and risk drop on every site.
  • Operations managersOne standard inspection process across every project, and the numbers to prove it.
  • Project managersSubcontractors and suppliers held to account for every open defect.
  • Site managersCatch issues early, with reports and follow-ups that write themselves.
  • ForemenResolve issues on the spot and coordinate with the other crews.
  • Offsite manufacturersQA done in the factory arrives on site with the item.

Builder or head contractor?See Matrak for builders

Your Matrak

Add Quality and what pairs with it.

Quality works on its own. It works harder with the modules that feed it.

Quality managersQuality

ITPs, inspections and sign-offs, from the drawings.

  • Custom ITPs and checklists
  • Pass, Fail, N/A with photos
  • Defects assigned automatically
  • ITP packs exported for handover
20 hrsa week of ITP admin goneHandover without the 3am panic.

Pairs well with

  • InstallationInstall photos pinned to the drawing, so every sign-off has proof.
  • ScheduleSign-offs roll straight into progress, so nobody writes a Friday report.
  • ManufacturingQA done at the factory arrives with the panel.

Add any. Build your Matrak to see the plan that fits.

In their words

Audit-proof, in their words.

Streamlining and tracking our ITPs and ITRs has directly improved quality management at Hickory. By automating this process and using technology to store critical data, we can confidently guarantee that all our quality records are compliant and audit-proof.
Michael ArgyrouDirector, Hickory31 projects to date
FAQ

Straight answers.

Anything not here? Ask Digi and someone from the team will reply by email.

Matrak · QualityFri 4:02pmAll Level 3 ITPs signed off24 of 24 inspections closed. Handover pack updated.

Hand over without the 3am panic.

Start free on up to 1,000 items, or build your Matrak and we'll recommend the plan that fits. Prefer a walkthrough? Book a demo.

Free plan: up to 1,000 active items, no card needed · Monthly or annual plans · AI Takeoff from A$89 a trade