Build my Matrak
For logistics companies

Become the builder's logistics partner.

Give builders live stock, QR-tracked deliveries and receipt QA, and win the tender on service instead of rate.

  • QR from warehouse to site
  • Fewer delivery turn-backs
  • Decant straight to the room
Two site workers in hard hats talk on a building site beside a yellow crane
Matrak · Inventory5:50am412 items ready to shipWarehouse stock, live for the builder.
Matrak · Logistics6:45amTruck 2 at gate 2, 7:10amCrane booked. No turn-back.
Matrak · Quality8:30amReceipt QA: 3 defects caughtFlagged before they reached the floor.
Matrak · Installation2:15pmDecanted to L5.01–L5.12Every room got its own items.

One record for builders, trades and suppliers, from the factory to handover.

projects run on Matrak
1,300+
of products tracked
$60B+
trades supported
90+
countries
18

Behind every number, a logistics team the builder treats as a partner.

  • Multiplex
  • John Holland
  • Gammon
  • Roberts Co
  • SRG Global
  • Built
  • Reece
  • Singyes
Where logistics gets squeezed

End the race to the bottom.

Fragmented systems and disconnected suppliers keep logistics on rate alone. Here's how Matrak turns each gap into a premium service.

  • Tenders won on rate alone.

    Sell a premium service instead: live tracking, receipt QA and just-in-time drops the builder can see.

  • Overseas production goes dark.

    Monitor manufacturing progress across continents, without a costly site visit.

  • Stock lost in the warehouse.

    QR tracking from warehouse to site: what's in stock, ready to ship and arriving, live.

  • Defects found after the drop.

    Catch issues at receipt, early in the chain, before they become costly re-orders.

  • Right item, wrong floor.

    Decant products and deliver them straight to the right rooms, guided by the drawings.

  • Another squeeze?

    Tell Digi where your margin leaks and it shows you the service that plugs it.

Find your fit

Pick the modules for your stages.

We've picked the supply side for you. See the stages you touch, and add what Matrak takes off each one.

I'm a…

You touch 4 of 7 stages. Matrak connects all seven, so nothing is typed twice.

  1. EstimateEstimation
  2. MakeManufacturing: you touch this stage
  3. SupplySupply chain: you touch this stage
  4. StockInventory: you touch this stage
  5. QualityQuality
  6. ScheduleSchedule
  7. CarbonCarbon: you touch this stage

Recommended for you

  • ManufacturingQR labels at the factory. Your client sees production without calling.
  • LogisticsDispatch to the hoist, every stillage scanned on the way.
  • ProcurementOrders and dates confirmed in one place instead of forty emails.
  • CarbonYour EPDs matched to every line, so you win the green tenders.
100%of items with a passportNo more “where's my panel?” calls.
What you and the builder see

Connected warehousing, live.

Know what's in stock, ready to ship and arriving at site, and give the builder the same view.

Every delivery's status, ETA and photo, grouped by stage.

Matrak deliveries grouped by status: not started, booked, packed, in transit, rejected and delivered
Deliveries grouped by status, with counts.
Case study · HD Logistics

A service builders had never seen.

HD Logistics tracked nothing past the drop, so their job ended at delivery, with no way to prove a defect wasn't theirs.

Read the HD Logistics story
  • Products tracked against each room
  • Manufacture to the roof, upstream and down
  • Evidence when damage isn't theirs

“Matrak has set us apart from our competitors. Through the app we track the products against each room via interactive drawings. This provides a level of visibility and control to the builders and developers who have never seen this service from a Logistics company.”

HD Logistics Case study
Integrations

Connect once. Everything flows.

Tap the systems you already use. Drawings, orders and paperwork sync in, and your team keeps working where it works.

In their words

Ask the people you deliver to.

Matrak played a crucial role in helping our FFE Team track the delivery and status of 9,000 individual equipment items within our 10-week program. Building 5 is now fully operational — a heartfelt thank you to you and your team.
Samantha RobinsonMME & FFE Project Manager, Canberra Hospital ExpansionACT Government health infrastructure
FAQ

Straight answers.

Anything not here? Ask Digi and someone from the team will reply by email.

MatrakFri 2:40pmAll Level 6 drops on time0 turn-backs this week.

Win on service instead of rate.

Start free on up to 1,000 items, or build your Matrak and we'll recommend the plan that fits. Prefer a walkthrough? Book a demo.

Free plan: up to 1,000 active items, no card needed · Monthly or annual plans · AI Takeoff from A$89 a trade