Build my Matrak
For installers and subcontractors

Proof of work, right on the drawing.

Log every install with photos on the drawing, catch defects before they cost you, and have materials land just in time.

  • No costly hardware
  • Photo proof on every install
  • Works with your spreadsheets
Two installers in hard hats read a drawing together on site
Matrak · Installation9:20amL03-046 installedTwo photos pinned to the drawing.
Matrak · Quality11:05amDefect logged on arrivalPhoto proves it wasn't your crew.
Matrak · LogisticsTue 6:45amLevel 5 delivery: 7:10amYour crew starts on time.
Matrak · ScheduleFri 3:50pmLevel 3 east: 100% installedProgress claim ready to send.

One record for builders, trades and suppliers, from the factory to handover.

projects run on Matrak
1,300+
of products tracked
$60B+
trades supported
90+
countries
18

Behind every number, a crew that stopped copping the blame.

  • Multiplex
  • John Holland
  • Gammon
  • Roberts Co
  • SRG Global
  • Built
  • Reece
  • Singyes
Where installers lose money

Five headaches off your crew's plate.

Defects, late deliveries and he-said-she-said land on the installer. Here's what Matrak takes off each one.

  • Defective stock lands on your crew.

    Capture defects with photos and notes the moment they're found, so the right party fixes them.

  • Materials too early, or too late.

    Just-in-time deliveries tracked from the supplier to your floor, so the crew never waits.

  • “Who signed that off?”

    Every action, photo and sign-off logged. A digital audit trail ends the blame game.

  • Progress updates eat your nights.

    Mark installs on the interactive drawing and the builder sees progress live. Claims follow.

  • Tender due. Drawings just landed.

    AI Takeoff prices the trade from the drawings in about 30 minutes, every item marked up.

  • Another headache?

    Tell Digi what keeps going wrong on your installs and it shows you the fix on your own drawings.

Find your fit

Pick the modules for your stages.

Installer is already picked. See the stages you touch, and add what Matrak takes off each one.

I'm a…

You touch 4 of 7 stages. Matrak connects all seven, so nothing is typed twice.

  1. EstimateEstimation: you touch this stage
  2. MakeManufacturing
  3. SupplySupply chain: you touch this stage
  4. StockInventory
  5. QualityQuality: you touch this stage
  6. ScheduleSchedule: you touch this stage
  7. CarbonCarbon

Recommended for you

  • AI TakeoffPrice the tender from the drawings in about 30 minutes.
  • InstallationInstall photos pinned to the drawing. Proof that ends the blame game.
  • QualitySign your ITPs on the phone, the moment the work is done.
  • LogisticsKnow your gear lands at the right gate, on the right day.
30 minper trade takeoffRevision D lands Friday. You still make dinner.
On site and in the office

Everything a few clicks away.

From material deliveries to installation issues, your whole job on one record, live on site and in the office.

Status lives on the drawing. Update a room or a panel and everyone sees it.

Matrak interactive floor plan with rooms coloured by status: arrived in yard, manufactured, in progress, defective
A floor plan coloured by status.
Case study · SRG Global

From 10 spreadsheets to none.

Documenting installed panels meant walking the whole building, taking photos and labelling them, then hours hunting for one panel later.

Read the SRG story
  • Up to 10 spreadsheets per project, now none
  • Colour-coded elevations for builders and clients
  • Built for the subcontractor as well as the builder

“To be able to open up an elevation or floor plan and it be colour coded, meant no one needed to spend hours looking at the minute details of each panel in order to understand its overall status or progress.”

SRG Global Case study
Integrations

Connect once. Everything flows.

Tap the systems you already use. Drawings, orders and paperwork sync in, and your team keeps working where it works.

In their words

Ask the crews who run it.

The open book approach is really the fundamental benefit to the system. The fact that we have that transparency creates trust — and that's key with our relationships with clients.
Malcolm DaviesConstruction Manager, SRG Global28 projects to date
FAQ

Straight answers.

Anything not here? Ask Digi and someone from the team will reply by email.

MatrakFri 4:30pmLevel 3 claim: backed by photosEvery install on the drawing, signed off.

Prove every install and get paid.

Start free on up to 1,000 items, or build your Matrak and we'll recommend the plan that fits. Prefer a walkthrough? Book a demo.

Free plan: up to 1,000 active items, no card needed · Monthly or annual plans · AI Takeoff from A$89 a trade