For data centre procurement

Track every critical part from factory to hall.

Track chillers, switchboards and UPSs from production to delivery across continents, with fewer surprises and fewer flights to the factory.

  • Hosted on AWS in Australia
  • Independent security audits + pen tests
  • No change management for suppliers
A data hall: rows of server racks either side of a lit aisle
Long-lead items · Hall 2 Live
  1. Chiller CH-01Hall 2 · plant deckShipped
  2. CRAC units, row BHall 2 · 12 unitsIn transit
  3. Main switchboard MSB-2Electrical room 2Factory inspection
  4. UPS modules A–DUPS room · 4 modulesIn transit

One record for builders, trades and suppliers, from the factory to handover.

projects run on Matrak
1,300+
of products tracked
$60B+
trades supported
90+
countries
18

Behind every number, a procurement team that knows where every long-lead item is.

  • Multiplex
  • John Holland
  • Gammon
  • Roberts Co
  • SRG Global
  • Built
  • Reece
  • Singyes
The long-lead board

Watch your critical plant move.

Every high-value component, from factory inspection to installed, updated from your suppliers' own reports.

  1. Chiller CH-01Hall 2 · plant deck · Shipped
  2. CRAC units, row BHall 2 · 12 units · In transit
  3. Main switchboard MSB-2Electrical room 2 · Factory inspection
  4. UPS modules A–DUPS room · 4 modules · In transit
  5. Switchboards SB-3 to SB-6Level 1 · 4 boards · Factory inspection
  • Chillers
  • CRAC units
  • Switchboards
  • UPSs
  • Anything with a part number

A sample board, built from the item types and stages above.

Where a data centre programme slips

Five risks, seen before they land.

Components procured years ahead, by global suppliers who won't change process for one project. Here's what Matrak takes off each risk.

  • A long-lead item slips, quietly.

    Live production status from your suppliers' own reports, so a slip shows months before delivery day.

  • Flying out to check the factory.

    Factory inspections with photos and a full activity log, for chillers, CRAC units, switchboards and UPSs.

  • Dozens of subcontractors and suppliers.

    One record connects every link, local and international, with every product in transit or on site.

  • “Is it on site? Is it installed?”

    Interactive 2D drawings show each component's location, install status and condition.

  • The client's ESG targets.

    Scope 3 carbon on every item, pulled from supplier data into auditable reports.

  • Another risk?

    Tell Digi the item that keeps you up at night and it shows you how it's tracked.

Inside Matrak

Every part's status in one place.

Component availability, timelines, inspections and carbon, for every part, in one place.

Embodied carbon per element, from the takeoff, tracked against your budget.

Embodied carbon per BoQ element, against budget, on every revision.
Find your fit

Pick the modules for your stages.

Owner and delivery teams see quality, schedule and carbon. Switch roles to see your suppliers' side too.

I'm a…

You touch 3 of 7 stages. Matrak connects all seven, so nothing is typed twice.

  1. EstimateEstimation
  2. MakeManufacturing
  3. SupplySupply chain
  4. StockInventory
  5. QualityQuality: you touch this stage
  6. ScheduleSchedule: you touch this stage
  7. CarbonCarbon: you touch this stage

Recommended for you

  • ScheduleEvery project's progress on one screen, live from site.
  • QualityAn audit-ready quality record, ready at handover.
  • CarbonScope 3 reported from real supplier data, on every project.
$60B+of products trackedKnow it's on track without a status meeting.
Mission-critical delivery · Canberra Hospital Expansion

9,000 critical items in 10 weeks.

Health infrastructure has the same rule as a data hall: nothing opens until every critical item is in, checked and commissioned.

  • 1:1 traceability by QR, item by item
  • Factory, warehouse and site checks with photos
  • A real-time, auditable record of what shipped, by when

“Matrak played a crucial role in helping our FFE Team track the delivery and status of 9,000 individual equipment items within our 10-week program. Building 5 is now fully operational.”

Samantha Robinson MME & FFE Project Manager, Canberra Hospital Expansion
Integrations

Connect once. Everything flows.

Tap the systems you already use. Drawings, orders and paperwork sync in, and your team keeps working where it works.

In their words

Ask the teams who deliver critical builds.

Matrak played a crucial role in helping our FFE Team track the delivery and status of 9,000 individual equipment items within our 10-week program. Building 5 is now fully operational — a heartfelt thank you to you and your team.
Samantha RobinsonMME & FFE Project Manager, Canberra Hospital ExpansionACT Government health infrastructure
FAQ

Straight answers.

Anything not here? Ask Digi and someone from the team will reply by email.

MatrakMon 9:00amAll Hall 2 plant on siteInspected, logged and ready to install.

No surprises at commissioning.

Start free on up to 1,000 items, or build your Matrak and we'll recommend the plan that fits. Prefer a walkthrough? Book a demo.

Free plan: up to 1,000 active items, no card needed · Monthly or annual plans · AI Takeoff from A$89 a trade