Build my Matrak
For builders and head contractors

Your trades and suppliers on one live record.

See every supplier's production, every delivery and every ITP in one place, with early warning before a delay hits your programme.

  • 1,300+ projects on Matrak
  • Early warning before a delay
  • No new app for the team
Queen's Wharf, Brisbane: towers under construction beside the river
Queen's Wharf, Brisbane · 75k+ products tracked
Matrak · Manufacturing7:12amLevel 9: 48 panels dispatchedLeft the factory on schedule.
Matrak · ScheduleMon 8:00amLevel 7 curtain wall: on track14 a day holds the date.
Matrak · QualityFri 4:02pmAll Level 3 ITPs signed off24 of 24 inspections closed.
Matrak · Logistics6:45amLevel 5 delivery: 7:10am, gate 2Supplier confirmed. Crane booked.

One record for builders, trades and suppliers, from the factory to handover.

projects run on Matrak
1,300+
of products tracked
$60B+
trades supported
90+
countries
18

Behind every number, a head contractor who stopped chasing.

  • Multiplex
  • John Holland
  • Gammon
  • Roberts Co
  • SRG Global
  • Built
  • Reece
  • Singyes
Where jobs go sideways

Put out five fires before they start.

Delays and mistakes that aren't your fault still land on your programme. Here's what Matrak takes off each one.

  • The wrong product lands on site.

    Every item carries a QR code from the factory, so you know what is on the truck before it reaches the gate.

  • The overseas factory goes quiet.

    Your manufacturers update the same system. You see production without another meeting.

  • “Done,” says the subbie.

    Digital ITPs with photos, signed on site. You know the checks were actually done.

  • Nobody knows if you'll hit the date.

    Run-rate reports show what each trade must install a day to hold the programme.

  • The client wants the carbon number.

    Scope 3 on every line, from real supplier data, before anyone asks.

  • Another fire?

    Tell Digi what keeps going wrong on your jobs and it shows you the fix on your own project.

Find your fit

Pick the modules for your stages.

Builder is already picked. See the stages you touch, and add what Matrak takes off each one.

I'm a…

You touch 5 of 7 stages. Matrak connects all seven, so nothing is typed twice.

  1. EstimateEstimation
  2. MakeManufacturing
  3. SupplySupply chain: you touch this stage
  4. StockInventory: you touch this stage
  5. QualityQuality: you touch this stage
  6. ScheduleSchedule: you touch this stage
  7. CarbonCarbon: you touch this stage

Recommended for you

  • QualityITPs built from your drawings. Trades sign off on site, with photos.
  • ScheduleProgress colours in on the drawing. Nobody asks “where are we at?”
  • LogisticsEvery delivery booked to a gate and a crane. Nothing to chase.
  • CarbonScope 3 on every line, ready before the client asks.
20 hrsa week of ITP admin goneHandover without the 3am panic.
From the office

See the whole job without a site walk.

Your PMs, CAs and coordinators see throughput, progress and quality live, with early warning before a delay.

The exact production and install rate, and the target your trades need to hit.

Matrak run-rate report: curtain wall QA'd on site versus installed per day, with a My Work list by elevation and level
Curtain wall QA'd on site vs installed, day by day.
The Regatta at Collins Wharf, Melbourne, at sunriseThe Regatta, Collins Wharf · Hickory
Case study · Hickory

22+ projects and still in control.

With 3 or 4 projects, you can probably manage things in Excel. But once you're working across more sites, with international supply involved, it's a different story.

Craig Hunter CTO, Hickory
  • Facade made in China, tracked to install
  • QA done on site, in Matrak
  • One record: factory, site and office

“I can pull out my phone and tell you exactly what's going on with our windows or precast panels, in real time.” Jad Farah, Hickory

Read the Hickory story
Integrations

Connect once. Everything flows.

Tap the systems you already use. Drawings, orders and paperwork sync in, and your team keeps working where it works.

In their words

Ask the builders who run it.

In over 10 years, Langston was one of the best projects we've ever run, and it's down to the use of Matrak. It was the savior on this project, especially when we couldn't travel due to the pandemic. I would never run a project without Matrak for tracking facade.
John HennessyConstruction Manager, Hutchinson Builders + Lipman28 projects to date
FAQ

Straight answers.

Anything not here? Ask Digi and someone from the team will reply by email.

MatrakFri 5:01pmSite's locked up. 0 things need you.All ITPs signed, Monday's deliveries confirmed.

Run the job instead of the inbox.

Start free on up to 1,000 items, or build your Matrak and we'll recommend the plan that fits. Prefer a walkthrough? Book a demo.

Free plan: up to 1,000 active items, no card needed · Monthly or annual plans · AI Takeoff from A$89 a trade