Build my Matrak
Construction cost savings

Savings you can measure, then repeat.

Matrak puts money back in the budget in four places, on every job you run: procurement, defects, delays and ESG reporting.

  • Up to 30% on procurement
  • 20% off defect costs
  • Penalties caught before they land
88 Queensbridge, a residential tower in Southbank, Melbourne
88 Queensbridge · $410M on Matrak
Matrak · Quality10:12amDefect caught at the factoryFixed before it shipped. No re-order.
Matrak · ScheduleMon 8:00amLevel 9 back on programmeSlip flagged 3 weeks out. No penalty.
Matrak · ProcurementWed 2:20pmFacade package: 3 quotes inDirect from suppliers on the network.
Matrak · CarbonFri 9:30amMonthly Scope 3 report: doneFrom supplier data. No spreadsheet.

One record for builders, trades and suppliers, from the factory to handover.

projects run on Matrak
1,300+
of products tracked
$60B+
trades supported
90+
countries
18

Behind every number, a margin that made it to the end of the job.

  • Multiplex
  • John Holland
  • Gammon
  • Roberts Co
  • SRG Global
  • Built
  • Reece
  • Singyes
Four places the money comes back

Where Matrak puts money back.

Measurable, repeatable savings, straight to the bottom line. Add the module that does each one.

  • up to 0%on procurement

    Direct access to quality, cost-effective global suppliers on the network, bypassing traditional procurement.

  • $0ka year off defect costs

    A 20% saving on typical annual defect costs of $4.8M, by getting things right the first time.

  • $0M+a week in penalties, avoided

    Delay penalties average over $1M a week. Live supply and production status flags the risk first.

  • Scope 0ESG, without the overhead

    Scope 3 carbon from supplier data: the credibility and compliance reporting clients demand.

Figures from Matrak's construction cost savings page. Your own number depends on your projects.

What would it save you?

Answer a few questions about your team's week. See the hours and dollars back, with every assumption shown.

Where a job leaks money

Guesswork kills margins.

Know what's really happening, find any item in seconds, and get visibility without change management.

  • Decisions made on guesswork.

    Run-rate reports and site progress graphs put reality at your fingertips, with issues flagged early.

  • Hours lost finding materials.

    Interactive drawings and QR codes show what's where, and when it's ready. Scan and keep moving.

  • Change management chaos.

    Matrak's AI reads your existing supply-chain documents from the systems you already use.

  • Defects found at handover.

    End-to-end tracking catches issues early, so you get it right the first time.

  • Estimating eats the tender window.

    AI Takeoff prices a trade from the drawings in about 30 minutes, every item marked up.

  • Another leak?

    Tell Digi where your last job lost money and it shows you where Matrak would have caught it.

Find your fit

See where your stages save money.

Pick your role. See the stages you touch, and add the modules that put money back.

I'm a…

You touch 5 of 7 stages. Matrak connects all seven, so nothing is typed twice.

  1. EstimateEstimation
  2. MakeManufacturing
  3. SupplySupply chain: you touch this stage
  4. StockInventory: you touch this stage
  5. QualityQuality: you touch this stage
  6. ScheduleSchedule: you touch this stage
  7. CarbonCarbon: you touch this stage

Recommended for you

  • QualityITPs built from your drawings. Trades sign off on site, with photos.
  • ScheduleProgress colours in on the drawing. Nobody asks “where are we at?”
  • LogisticsEvery delivery booked to a gate and a crane. Nothing to chase.
  • CarbonScope 3 on every line, ready before the client asks.
20 hrsa week of ITP admin goneHandover without the 3am panic.
Know what's really happening

Reality at your fingertips.

Track every milestone, flag issues before they're problems, and decide with confidence.

Every level coloured in from site, with issues showing before the walk.

Matrak progress tracker: each level's status across every trade stage, from not started to in progress
Every level's progress, live from site.
Case study · Hickory

Quality records that pay for themselves.

Rework and warranty claims start with a check nobody can prove was done. Hickory made every record compliant and audit-proof.

Read the Hickory story
  • ITPs and ITRs tracked automatically
  • Audit-proof quality records
  • Scaled to 22+ projects on Matrak

“Streamlining and tracking our ITPs and ITRs has directly improved quality management at Hickory. By automating this process and using technology to store critical data, we can confidently guarantee that all our quality records are compliant and audit-proof.”

Michael Argyrou Director, Hickory
In their words

Ask the people who kept the margin.

Streamlining and tracking our ITPs and ITRs has directly improved quality management at Hickory. By automating this process and using technology to store critical data, we can confidently guarantee that all our quality records are compliant and audit-proof.
Michael ArgyrouDirector, Hickory31 projects to date
FAQ

Straight answers.

Anything not here? Ask Digi and someone from the team will reply by email.

MatrakFri 5:00pmJob closed on budgetNo penalties and no surprise re-orders.

Keep the margin you priced.

Start free on up to 1,000 items, or build your Matrak and we'll recommend the plan that fits. Prefer a walkthrough? Book a demo.

Free plan: up to 1,000 active items, no card needed · Monthly or annual plans · AI Takeoff from A$89 a trade