Case study · Builder

Icon Construction

Material Tracking

Matrak-website-casestudie-icon

At a glance

Key Challenges

  • Lack of visibility across job site and Complex integrated joinery

Big Wins

  • Quality project delivery two months ahead of schedule

Favourite Features

  • Mobile notifications and real-time updates

“

Matrak was the tool that brought together the overseas procurement together with the local installer and site team. Helping Icon deliver their project 2 months ahead of schedule."

The Problem

  1. Procuring from overseas means Icon was facing major lag time in material delivery, air freight and too long wait time for materials up to 2-4 weeks. This meant that if any defects weren’t instantly communicated it could risk the project running on time.
  2. The joinery was so integrated for this project that they couldn’t risk any components missing to complete this work.

The Solution

  1. Instant mobile notifications made reporting defects and issues back to the factory instantaneous.
  2. Updated material records to live interactive drawings gave clarity for CNC and Icon to understand the health of the project and whether it was running on schedule.
  3. Tracked material shipping status to know where and when materials where coming to site.
icon case study

Your project, tracked like theirs.

Start free on up to 1,000 items, or build your Matrak and we'll recommend the plan that fits. Prefer a walkthrough? Book a demo.

Free plan: up to 1,000 active items, no card needed · Monthly or annual plans · AI Takeoff from A$89 a trade