Company: Lipman, Viridi Group, Kavanagh Industries and Teggman Precast
At a glance
report
Key Challenges
Tracking and coordinating rapid delivery of innovative DfMA trades using MMC processes
Coordination and installation of prefabricated, precast and pod-style building components to site by multiple contractors
The system needed to be easy for different installers and logistics, with unique & novel methods of construction
construction
Solution
Tracking commenced in the collaborator companies’ warehouses, fabrication of timber prefab members, prefab carrier frames, precast panels ready for transport
Piling works tracked using Matrak, allowing Lipman to better coordinate early works w/ later trades
Fabrication, logistics, quality and install tracked by subcontractors, giving better visibility to Lipman as General Contractor
trending_up
Result
Lipman was able to better coordinate early works with later trades by tracking their piling works in Matrak
Better visibility by tracking all fabrication, logistics, quality and install in one system
An end-to-end materials passport for products, with full audit history