Case study · Builder

Gregory Hill Public School

Company: Lipman, Viridi Group, Kavanagh Industries and Teggman Precast

Lipman Logo

At a glance

Key Challenges

  • Tracking and coordinating rapid delivery of innovative DfMA trades using MMC processes
  • Coordination and installation of prefabricated, precast and pod-style building components to site by multiple contractors
  • The system needed to be easy for different installers and logistics, with unique & novel methods of construction

Solution

  • Tracking commenced in the collaborator companies’ warehouses, fabrication of timber prefab members, prefab carrier frames, precast panels ready for transport
  • Piling works tracked using Matrak, allowing Lipman to better coordinate early works w/ later trades
  • Fabrication, logistics, quality and install tracked by subcontractors, giving better visibility to Lipman as General Contractor

Result

  • Lipman was able to better coordinate early works with later trades by tracking their piling works in Matrak
  • Better visibility by tracking all fabrication, logistics, quality and install in one system
  • An end-to-end materials passport for products, with full audit history
  • Gained end-of-life and O&M support

Your project, tracked like theirs.

Start free on up to 1,000 items, or build your Matrak and we'll recommend the plan that fits. Prefer a walkthrough? Book a demo.

Free plan: up to 1,000 active items, no card needed · Monthly or annual plans · AI Takeoff from A$89 a trade